September 2018 - September 2018
Central Sulawesi, Indonesia

Yaentu site is a run-of-river hydropower plant located in the city of Poso, Central Sulawesi. Construction will begin in 2019 and the installed capacity of the plant is 10.0 MW.

Our scope of work started from the feasibility study which includes the optimum capacity of the hydropower plant, discharge data analysis, geological analysis, basic design for optimum layout,  and the electricity interconnection study of the project. The scope of work also included basic design and the detail engineering design for construction of the project.