slider

PROJECTS

Project Tomasa

April 2019 - April 2019
Central Sulawesi, Indonesia

Tomasa site is a run-of-river hydropower plant located in the city of Poso, Central Sulawesi. Construction began in 2016 and the plant is on track to be commercially operational by 2019. The installed capacity of the plant is 10.0 MW with an estimated annual energy output of 61,000 MWh.

Our scope of work started from the feasibility study including the electricity interconnection study of the project, basic design and the detail engineering design for construction.